Pictures At left, VK6KDX, VK6HGR, VK6HRC and VK6ZDW putting some final
touches on the tower construction.
At right, VK6HRC up the
tower doing an excellent job.
At left, VK6FJA installing the main
controller with help from VK6JGW.
At right, VK6FJA assessing the power
situation with VK6JGW putting the final bolts in the
rack.
This page is reviewed as
necessary and may not reflect the current status of the VK6RNC
site.
More information will be provided soon. . (c) VK6FJA Jan-20 04